72 Ave Arterial Widening 188 to 196

72 Ave Arterial Widening 188 to 196

Project Name: 72 Ave Arterial Widening 188 to 196Project Location: SurreyClient: City of SurreyDuration: 1 yearScope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic...
Brookswood Firehall Offsite TP3

Brookswood Firehall Offsite TP3

Project Location: Langley Client: Kinetic Duration: 5 months Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals
LSAP Early Works Earthworks and Utilities

LSAP Early Works Earthworks and Utilities

Project Name: LSAP Early Works Earthworks and Utilities Project Location: Langley Client: Smith Brothers Wright Duration: 12 months Scope: ESC, Strip topsoil and overburden, Asphalt parking lot, bulk excavation and backfill, Detail excavation and backfill, building...
BC Hydro Material Classification Facility

BC Hydro Material Classification Facility

Project Name: BC Hydro Material Classification Facility Project Location: Client: Omicron Duration: 8 months Scope: ESC, bulk and detailed Excavation and dumping, trenching, bedding and backfill, Storm detention tank, sanitary, storm sewer and water systems, Site gas...
Brookswood Firehall

Brookswood Firehall

Project Name: Brookswood Firehall Project Location: Langley Client: Township of Langley Duration: 3 months Scope: Replacing existing firehall with a new post-disaster, satellite firehall. Works inclusive of bulk excavation, ESC system (phase 1), and disposal. Clearing...