PROJECTS
YVR – Emergency Pavement & Drainage Rehab Apron IV
Project Name: YVR – Emergency Pavement & Drainage Rehab Apron IV Project Location: YVR - Richmond Client: Vancouver Airport Authority Duration: 6 weeks Scope: Mobilization (Survey, ESC, Prelocates). Works outside wingtip clearance (removals, excavation, manhole...
Purolator Civil Site Services
Project Name: Purolator Civil Site Services Project Location: Coquitlam Client: Beedie Construction Duration: 4 months Scope: The project scope includes onsite and offsite civil works, mechanical and electrical excavation, slab preparation, backfilling, subbase...
DP World – Fraser Surrey Truck Gate
Project Name: DP World – Fraser Surrey Truck Gate Project Location: Surrey Client: DP World Fraser Surrey Inc Duration: 4 Months Scope: Demolition of existing gate infrastructure, construction of a new container truck gate, installation of civil, electrical, and...
Smith Campus
Project Name: Smith CampusProject Location: LangleyClient: Turner Construction CompanyDuration: 4 monthsScope: Site Stripping & Clay (Disposed Offsite), import fill, site setup, site maintenance, street sweeping, ESC, dewatering.
72 Ave Arterial Widening 188 to 196
Project Name: 72 Ave Arterial Widening 188 to 196Project Location: SurreyClient: City of SurreyDuration: 1 yearScope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic...
Brookswood Firehall Offsite TP3
Project Location: Langley Client: Kinetic Duration: 5 months Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals