by Kuldip Cheema | Jun 2, 2025 | Communications
Project Name: Smith CampusProject Location: LangleyClient: Turner Construction CompanyDuration: 4 monthsScope: Site Stripping & Clay (Disposed Offsite), import fill, site setup, site maintenance, street sweeping, ESC, dewatering.
by Kuldip Cheema | Jun 2, 2025 | Communications
Project Name: 72 Ave Arterial Widening 188 to 196Project Location: SurreyClient: City of SurreyDuration: 1 yearScope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic...
by Kuldip Cheema | May 1, 2025 | Communications
Project Name: 72 Ave Arterial Widening – 188 to 196 Project Location: Surrey Client: City of Surrey Duration: 9 months Scope: Concrete walks, curb and gutters. Electrical works, roadway lighting. Clearing and grubbing, excavation trenching and backfill. Roads and...
by Kuldip Cheema | May 1, 2025 | Communications
Project Location: Langley Client: Kinetic Duration: 5 months Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals
by Kuldip Cheema | May 1, 2025 | Communications
Project Name: LSAP Early Works Earthworks and Utilities Project Location: Langley Client: Smith Brothers Wright Duration: 12 months Scope: ESC, Strip topsoil and overburden, Asphalt parking lot, bulk excavation and backfill, Detail excavation and backfill, building...