Project Name: Smith CampusProject Location: LangleyClient: Turner Construction CompanyDuration: 4 monthsScope: Site Stripping & Clay (Disposed Offsite), import fill, site setup, site maintenance, street sweeping, ESC, dewatering.
72 Ave Arterial Widening 188 to 196

72 Ave Arterial Widening 188 to 196

Project Name: 72 Ave Arterial Widening 188 to 196Project Location: SurreyClient: City of SurreyDuration: 1 yearScope: 1700m roadworks along 72 Ave and side streets, including excavation, asphalt paving, markings, signage, granular materials, pedestrian signal, traffic...
72 Ave Arterial Widening – 188 to 196

72 Ave Arterial Widening – 188 to 196

Project Name: 72 Ave Arterial Widening – 188 to 196 Project Location: Surrey Client: City of Surrey Duration: 9 months Scope: Concrete walks, curb and gutters. Electrical works, roadway lighting. Clearing and grubbing, excavation trenching  and backfill. Roads and...
Brookswood Firehall Offsite TP3

Brookswood Firehall Offsite TP3

Project Location: Langley Client: Kinetic Duration: 5 months Scope: ESC, Roadworks onsite, building earthworks, Utilities (storm, sani, water) BC Hydro works, Roadworks (27th ave and 200th street) Landscape works and traffic signals
LSAP Early Works Earthworks and Utilities

LSAP Early Works Earthworks and Utilities

Project Name: LSAP Early Works Earthworks and Utilities Project Location: Langley Client: Smith Brothers Wright Duration: 12 months Scope: ESC, Strip topsoil and overburden, Asphalt parking lot, bulk excavation and backfill, Detail excavation and backfill, building...