CP Thompson Structural Works project is awarded to Tybo, scope of work includes bridge works, rebuilding CP bridge that was destroyed during the 2021 fall floods. Realigning shoefly, installing bridge piles, pile caps, concrete struts, bridge abutments and wingwalls. Assemble and install bridge superstructure. Realign truck to new bridge, remove shoefly.
CP Thompson Structural Works