Luxor Bridge
Project Location: North of Radium Hot Springs
Client: Ministry of Transportation and infrastructure
Duration: 6 month
Value: 3.9 Million
Scope: Construct a two lane bridge on grade, remove embankment and culvert below the bridge and remediate the Luxor Creek to environmental standards
Project Description: Tybo was contracted to build a two lane span that would eventually span Luxor Creek as well as remove the material below the bridge. The bridge was built to replace an aging culvert that was installed some time ago that allowed Luxor creek to flow below the highway.