Skytrain Operation and Maintenance Center Expansion

To make space for added Trains for the Skytrain, Tybo was awarded the $4.6 million  contract with Translink for the expansion of the Operations and Maintenance Center in Burnaby BC. To add 4 tracks to the System Tybo removed 15,000 m3 of excavation material for the construction of a 1000m2  MSE retaining wall and an additional 2000m2 of Shotcrete shoring and Architectural Concrete walls. Also included in this project was the installation of underground storm water system a design build overhead steel walkway.