North Fork Bridge Replacement

  • 3.5-km section widened to four lanes
  • Four-lane bridge replaces existing truss bridge, which is nearing the end of its service life
  • Paved centre median with 2.6-metre-wide barrier
  • 2.5-metre-wide paved shoulders
  • Rumble strips
  • 1.7 km of new frontage roads
  • Two new protected T-intersections
  • Retaining wall to avoid impacts on rail corridor